Morris & Perry Asphalt Plant - Gurney Slade QuarryTar Plant

Products generally to BS4987-1 in limestone


Collected or delivered - minimum load 1 tonne

 

 

Asphalt/Macadam Laying Guidance (Material Thickness)

RECOMMENDED
LAYING DEPTHS

Nominal layer Thickness Minimum
Thickness
SMA 10 Surf  LS  0.4% Fibres 20 – 30mm 15mm
SMA 6 Surf 70/100  LS  0.4% Fibres 25 – 35mm 20mm
AC 10 Close Surface LS 30 – 40mm 25mm
AC 14 Close Graded Surface Course LS 40 – 55mm 35mm
AC 20 Dense Bin  LS 50 –100mm 40mm
 
 

Coverage -   

m2 – TONNES CALCULATION

At an average thickness of

1 tonne will cover
20mm 18 – 24 m2
25mm 15 – 19 m2
30mm 13 – 15 m2
40mm 10 - 12 m2
50mm 8 – 10 m2
60mm 7 – 8.5 m2
75mm 5 – 6.5 m2
100mm 4 – 5   m2


Relates to Dense, Medium, Close Graded and SMA.
Open graded will give greater coverage.

For further Information on Macadam/Asphalt Road Construction please click here >>

 
 

OUR DELIVERY VEHICLES

Tipper Truck 

4 wheelers (2 axle) - carry approx 10 tonnes
6 wheelers (3 axle) - carry approx 16 tonnes (Pictured)
8 wheelers (4 axle) - carry approx 20 tonnes
Optimum £/tonne load = 16 tonnes and above

Vehicles are insulated and are available with chutes for hand lay if required.

Please contact us for further information >>

 
 

Common Questions

 

What does 'Pen' mean?

Refers to “penetration” and is a measure of the binder bitumen grade. Most of our macadams can be supplied with a choice of 2 binder grades, SMA in 50 or 85Pen and most other materials 125 or 190Pen. The higher the Pen the softer the binder.

What are 'Dayworks'? 

If you are hand laying and want the vehicle to remain on site as hot storage, you will need to pre book dayworks. This is charged at a rate per hour and begins on arrival.